7 Claude app mistakes that cost tokens, money, or the company
Seven mistakes we see in production Claude apps. Some cost tokens, some cost money, one or two can cost the company. Each one has a simple fix.
Field notes on AI-native products, design systems, web engineering, SaaS economics and modern infrastructure. New articles every week, sources included.
Seven mistakes we see in production Claude apps. Some cost tokens, some cost money, one or two can cost the company. Each one has a simple fix.
Page 2 of 8
Product Design · Jul 6, 2026
Most SaaS dashboards fail by showing everything at once. Here is the summary-first layout, the widget limit, and progressive disclosure that keeps users oriented.
AI and Automation · Jul 5, 2026
CLAUDE.md loads into every Claude Code session, so every line competes for attention. Keep it under 120 lines, write positive rules, and move fixed checks to hooks.
Infrastructure and SEO · Jul 4, 2026
JSON-LD is Google's recommended structured-data format. Here is the exact Article, BreadcrumbList, and FAQPage markup we ship on every post, with Next.js code.
Web Design and Engineering · Jul 3, 2026
Subsetting cuts a font file by 80%, WOFF2 compresses 30% tighter than WOFF, and size-adjust removes swap layout shift. The self-host playbook we run.
Product Design · Jul 2, 2026
A three-tier scheme (primitive, semantic, component) keeps token names stable as a system grows. Here is how to structure and name each layer.
AI and Automation · Jun 30, 2026
AI agents read your site through the accessibility tree, the structure screen readers use. In a 2026 study, agent task success fell from 78% to 42% on a degraded one.
Business and Scale · Jun 29, 2026
An MVP in 2026 runs from about $10K for a lean proof of concept to $200K+ for a regulated or AI-heavy build. Scope, not hourly rate, sets the number.
Infrastructure and SEO · Jun 28, 2026
Before a SaaS site goes live, eight technical SEO checks decide whether Google and AI engines can find it: Core Web Vitals, schema, crawl access, indexing.
Web Design and Engineering · Jun 27, 2026
Total Blocking Time is 30% of the Lighthouse score, yet most teams fix the wrong metric. The six production mistakes that crater it, and how to fix each.
Product Design · Jun 26, 2026
Only 8% of teams call their design system stable. Component drift is the gap between the system you designed and the UI that ships. Here is how to catch it.
Infrastructure and SEO · Jun 25, 2026
Self-hosting Next.js on a managed VPS can cut a $600 Vercel bill to about $90. Here is what you trade away, and the month the swap is worth it.
Business and Scale · Jun 24, 2026
Half of failed outsourcing deals die in the first 60 days. A five-step playbook to scope, price, vet, and contract a product engineering studio that ships.
94 articles